Siding overview
Type
Bulk Terminal
Monthly tonnage
200 000 t
Primary commodity
Thermal Coal
Operations
24/7 Staffed
Province
Mpumalanga
Corridor
Richards Bay Coal Line
Also known as
Woestalleen
Siding location
Woestalleen Siding — Mpumalanga. Click the boundary polygon to view operational area.
Assets & equipment
Woestalleen Siding deploys a total complement of 12 assets for loading, excavation and weighing on the Richards Bay Coal Line.
Plant on site is assigned to continuous thermal-coal loading, with dual weighbridges independently verifying inbound and outbound tonnage.
- 7 RB 866H front-end loaders deployed for stockpiling and train loading
- Doosan excavator supporting stockpile and bench work
- 2 weighbridges for inbound and outbound measurement
- Loading fleet assigned to 24/7 siding operations
- Site support plant covering stockpile management
- Weighing and dispatch controls aligned to TFR cycle times
Technology in our operations
We keep looking for better ways to run our sidings. Digital tools now support how we plan, load and release trains, giving our teams and clients more accurate information, faster turnaround and safer operations. We keep testing and adopting new technology wherever it improves the service we deliver.
Security & weighbridge controls
Woestalleen Siding operates under Barberry's full security and stock integrity protocols. All incoming and outgoing product movements are independently verified to ensure tonnage accuracy, cargo integrity and complete audit trail compliance for siding owners, clients and financiers.
- Certified computerised weighbridge for inbound truck and outbound wagon measurement
- Independent tonnage reconciliation — trucks received vs wagons dispatched
- Access control at all siding entry and exit points
- 24-hour security presence and CCTV monitoring
- Proof of Delivery (POD) sign-off with TFR for all train movements
- Daily security and tonnage reports submitted to siding owner and client